|
Klassiska filtyper är inte längre tillgängliga för användning från och med januari 2021. Du kan överföra dina klassiska filer eller ladda ner en PDF. Läs mer

Override manual inputted approved field

Planerat
7

Kommentarer

6 kommentarer

  • Officiell kommentar
    Isabel Messore
    Hi everyone,
     
    The feature Steve mentioned, Connected Metric Value Snapshots, are available now for all Sustainability Reporting customers.
     
    When a metric value is Completed (regardless of how it was collected — via connected source file, Workiva Tasks, or directly in the Program), the Sustainability Program automatically takes a snapshot of the value at the moment of completion.
    • After completion, the value is frozen — subsequent edits to the connected source file will not automatically update the metric value in the Program
    • If the source file value later changes, the Program alerts users via:
    • Inline indicators (triangle icons) on the metric and source file's Sustainability or Tasks panel
    • Email notifications (if enabled by a Program Owner from Program settings)
    • Health check results from Program overview
    Note: If the connected value status is not Complete, it remains a live connection and will continue to auto-update from the source.
     
    If a Source Value Changes Post-Completion.....to update the metric with the new source value, a Program Owner, Editor, or Task Owner must:
    • Reset the value or its task from the metric to restart data collection, OR
    • -Reopen the task from the connected source file, then choose to complete it on behalf of the assignee
    To keep the metric value as it was when Completed — do nothing. The snapshot is preserved.

    Run a health check from Program overview to find all Completed metric values that differ from their connected source:
    1. Select Program overview from the outline
    2. Choose the Program year to inspect
    3. Click Run health check under Health
  • Steve Stegelin

    Hi Susan, thanks for the feedback! We do indeed currently have work in flight to preserve values within Sustainability Program upon task completion — regardless of their source — and prevent automatic updates based on subsequent edits to a connected source file. In the meantime, you may consider collecting values through the Workiva Tasks portal instead of a connected spreadsheet, as its values automatically lock and can't be edited upon task completion.

    0
  • Susan De Boever

    Hi Steve 

    Thanks a lot for your feedback.

    Question related to the planning: do you have an idea on when this will be available in the platform, as I see the status of my comment changed to 'planned'.

    Regards

    Susan De Boever

    0
  • Steve Stegelin

    Hi Susan! There's no firm timeline at the moment given other work in flight; tentatively a few months, possibly closer toward the end of the year.

    0
  • Anne Pfuntner

    Steve Stegelin is there a ticket for this in progress work that I can be tagged to to receive updates? I'm also interested in this enhancement

    0
  • Brooke Mortvedt

    Hi Anne Pfuntner - I have you added to receive these updates :)  Thanks again! 😊

    0

Du måste logga in om du vill lämna en kommentar.