|
Les types de fichiers classiques ne pourront plus être utilisés à partir de janvier 2021. Vous pouvez transférer vos fichiers classiques ou télécharger un PDF. En savoir plus

Override manual inputted approved field

Planifiée
7

Commentaires

6 commentaires

  • Commentaire officiel
    Isabel Messore
    Hi everyone,
     
    The feature Steve mentioned, Connected Metric Value Snapshots, are available now for all Sustainability Reporting customers.
     
    When a metric value is Completed (regardless of how it was collected — via connected source file, Workiva Tasks, or directly in the Program), the Sustainability Program automatically takes a snapshot of the value at the moment of completion.
    • After completion, the value is frozen — subsequent edits to the connected source file will not automatically update the metric value in the Program
    • If the source file value later changes, the Program alerts users via:
    • Inline indicators (triangle icons) on the metric and source file's Sustainability or Tasks panel
    • Email notifications (if enabled by a Program Owner from Program settings)
    • Health check results from Program overview
    Note: If the connected value status is not Complete, it remains a live connection and will continue to auto-update from the source.
     
    If a Source Value Changes Post-Completion.....to update the metric with the new source value, a Program Owner, Editor, or Task Owner must:
    • Reset the value or its task from the metric to restart data collection, OR
    • -Reopen the task from the connected source file, then choose to complete it on behalf of the assignee
    To keep the metric value as it was when Completed — do nothing. The snapshot is preserved.

    Run a health check from Program overview to find all Completed metric values that differ from their connected source:
    1. Select Program overview from the outline
    2. Choose the Program year to inspect
    3. Click Run health check under Health
  • Steve Stegelin

    Hi Susan, thanks for the feedback! We do indeed currently have work in flight to preserve values within Sustainability Program upon task completion — regardless of their source — and prevent automatic updates based on subsequent edits to a connected source file. In the meantime, you may consider collecting values through the Workiva Tasks portal instead of a connected spreadsheet, as its values automatically lock and can't be edited upon task completion.

    0
  • Susan De Boever

    Hi Steve 

    Thanks a lot for your feedback.

    Question related to the planning: do you have an idea on when this will be available in the platform, as I see the status of my comment changed to 'planned'.

    Regards

    Susan De Boever

    0
  • Steve Stegelin

    Hi Susan! There's no firm timeline at the moment given other work in flight; tentatively a few months, possibly closer toward the end of the year.

    0
  • Anne Pfuntner

    Steve Stegelin is there a ticket for this in progress work that I can be tagged to to receive updates? I'm also interested in this enhancement

    0
  • Brooke Mortvedt

    Hi Anne Pfuntner - I have you added to receive these updates :)  Thanks again! 😊

    0

Vous devez vous connecter pour laisser un commentaire.