|
自 2021 年 1 月起,傳統文件類型將不再可用。您可以轉換傳統檔案或下載 PDF。進一步瞭解

Can you cross check amounts from different files/folders?

已回覆
0

評論

1 條評論

  • Lynn Kaminski

    Yes, this can be set up very easily.  We actually link amounts from 10Q/K documents to the earnings release documents where possible. All of the related documents are included in one "Primary Project" for each quarter, and that Primary Project is what is rolled over/copied each quarter so the links stay connected.  We then build out a separate 10Q/K project and a separate 8K project for each respective filing, and include the related documents from the Primary Project that are needed for each filing.  Hope that makes sense!  If not, your CSM should be able to help.

    0

登入寫評論。