|
2021년 1월부터 기존 파일 형식을 더 이상 사용할 수 없습니다. 기존 파일을 전환하거나 PDF를 다운로드할 수 있습니다. 자세히 알아보기

Can you cross check amounts from different files/folders?

답변함
0

댓글

댓글 1개

  • Lynn Kaminski

    Yes, this can be set up very easily.  We actually link amounts from 10Q/K documents to the earnings release documents where possible. All of the related documents are included in one "Primary Project" for each quarter, and that Primary Project is what is rolled over/copied each quarter so the links stay connected.  We then build out a separate 10Q/K project and a separate 8K project for each respective filing, and include the related documents from the Primary Project that are needed for each filing.  Hope that makes sense!  If not, your CSM should be able to help.

    0

댓글을 남기려면 로그인하세요.